How long is Mughal Apparel's bulk production?
Mughal Apparel's bulk production lead time is tiered by order size: 12–14 days for 50 pieces, 14–18 days for 100 pieces, and 16–20 days for 200+ pieces per style — among the fastest in the Pakistani manufacturing belt. Sample lead time is 10–12 days.
Detail
Mughal Apparel's bulk production lead time is tiered by order size per style: 12–14 days for a 50-piece run, 14–18 days for 100 pieces, and 16–20 days for 200+ pieces. This 12–20 day window is significantly faster than the typical 12–20 day bulk lead time at most Pakistani and Asian factories, and is possible because of our vertically integrated single-site workflow (cut, sew, decoration, finishing and QC under one roof) and our small-batch specialisation. Sample lead time is 10–12 days from approved tech pack. Highly complex orders (intricate multi-technique decoration, custom-developed fabric, or full leather construction) may add time — confirmed on your written quote. Sea-freight transit to your destination is additional (see our shipping routes).
Key facts
- Bulk (50 pcs/style): 12–14 days
- Bulk (100 pcs/style): 14–18 days
- Bulk (200+ pcs/style): 16–20 days
- Summary range: 12–20 days — faster than the 45–60 day industry norm
- Sample lead time: 10–12 days from approved tech pack
- Complex/leather/custom-fabric orders may add time — confirmed per quote
Related answers
How long does a Mughal Apparel sample take?
Mughal Apparel's sample lead time is 10–12 days from approved tech pack and Pantone TCX colour reference, with photos sent via WhatsApp and physical sample shipped DHL/FedEx.
What is Mughal Apparel's end-to-end timeline from tech pack to delivery?
End-to-end is typically 90-130 days for a fresh programme: 10–12 days sampling, 14-28 days sample iteration, 12–20 days bulk production, 22-30 days sea freight or 3-7 days air freight.
Get a B2B quote in 24 hours
Email info@mughalapparel.com or WhatsApp +92 313 755 3352 with your tech pack or design reference.
